In this article I will answer frequently asked questions that arise before buying a shower. Here talk about the training area and the requirements that must be taken into account. Typically, our customers to buy a shower, we will send you by fax or e-mail wiring harness, his chosen cabin. is to prepare in advance the necessary conclusions. Installing shower in enclosed, specially prepared for this, in strict accordance with these recommendations. warning! In preparation water communications to connect the equipment you must install a mechanical water filters, with the degree of purification of 100 microns.
Pressure of the water supply system must be in the range of 1.5 to 5 atm. In case of excess pressure, you must install the water pressure reducer. Filters, just pressure reducers water as standard equipment are not included. Conclusions hot and cold water must have an internal thread and diameter. inches. Diameter sewer pipe 40 -50 mm.Esli conclusion sewage into the wall, the distance from the finished floor to the center of the pipe must not exceed 50 mm. If the distance is longer, you have to make the podium.
Podium under the shower cabin in a strict order to be faced with floor tiles. Connect the equipment to the mains must be performed without additional compounds, ie a separate cable from the electrical panel to equipment. The cable shall be copper, three-core, double insulation with a wire cross-section 2,5 mm square. Conclusion power cable must be located in a place designated in the Technical Data Sheet and have a grounded receptacle. The cable must be connected to a separate, two-pole machine gun, combined with a protective device (RCD). Requirements for UST: Voltage 220 - 240V, with leakage current 0.03 A, 16-25A. For installation and subsequent maintenance equipment necessary to clear space for two rear side of the cab not less than 50 cm, to provide access to all work sites and aggregates. Ceiling height in the room, prepared to install a shower should provide a gap between the roof and ceiling shower at least 10-15 cm maximum temperature when using acrylic shower stalls shall not exceed 60 degrees Celsius. Area for mounting a shower cab should be cleared of construction debris and various contaminants. All repairs and finishing work during installation should be a mandatory completed, including ceilings. All communications should be hidden strip, or be removed in the decorative door. This will help avoid gapping products to the wall. Area for the installation should not have any protrusions and borders. I hope this article will help you avoid errors and defects, which are sometimes faced by our clients.

Posted by: |